When your UPS fails, your facility has minutes — not hours. Our technicians are on-call around the clock, carry parts for Eaton, Vertiv, and APC systems, and know the difference between a transfer trip and a failed bypass. 20+ years of combined experience on UPS installation, service, and emergency repair across Arizona. ROC #348619. 24/7 statewide.

New Phase Electrical
Bonded & Insured WOSB Certified OSHA 10 Certified Statewide Arizona Coverage

What a UPS Failure Costs in Arizona

Data center operators losing $9,000 or more per minute of unplanned downtime, NFPA 99 obligations on a hospital's critical branch, FCC reporting thresholds for telecom at 30 minutes — the stakes in your facility are already written into your contracts and regulatory framework. You don't need them explained. You need a partner who shows up fast, works clean in live facilities, and leaves documentation your compliance team can use.

Most UPS failures are preventable — a battery test that got skipped, a PM visit that kept getting deferred, a maintenance window pushed one quarter too many. The failure mode is almost always the same. The timeline isn't.

When it does happen — we're the call you make. 24/7, real technicians, parts on hand for Eaton, Vertiv, and APC systems. Arizona-wide coverage.

New Phase technician testing UPS electronics with Fluke multimeter, Arizona

UPS Services We Provide

Every uninterruptible power supply we service gets a documented assessment — battery condition, runtime capacity under load, bypass functionality, and thermal performance. We work on your schedule, not ours.

Installation & Commissioning

New UPS installation from site assessment through load bank testing and final commissioning. We coordinate with your facility team to ensure zero-interruption cutover.

UPS Replacement

End-of-life UPS replacement with minimal downtime. We handle rigging, removal, and disposal of the old unit, and commission the replacement with full load testing.

Maintenance Bypass Installation

A static bypass switch lets your UPS be serviced without powering down the protected load. Critical for any facility that can't afford a maintenance window.

Battery Testing & Replacement

Thermal imaging, discharge testing, and impedance testing to identify weak cells before they fail. VRLA, AGM, and lithium-ion battery string replacement across all major UPS brands.

Preventive Maintenance Programs

Scheduled preventive maintenance visits on your cadence — monthly, quarterly, or semi-annual. We document every inspection, flag issues before they escalate, and maintain full service records.

24/7 Emergency Response

UPS failure doesn't wait for business hours. Call 480-262-6505 any hour. Real technicians. Parts on hand. Arizona-wide coverage.

UPS Brands We Service

Eaton · Vertiv (Liebert) · Schneider Electric (APC) · Toshiba · Powerware · General Electric · MGE · Minuteman · Tripp Lite — and most legacy systems still in operation at Arizona facilities.

The Arizona Factor

We've pulled battery strings from Phoenix data centers that showed healthy impedance in October and delivered 60% rated capacity the following August. We've traced UPS failures to intake filters packed with dust from a single haboob that nobody caught on the next PM check. We've replaced capacitor banks worn years ahead of schedule in server rooms where the HVAC was undersized for a Valley July.

Our PM schedules reflect what we've actually seen out here: battery impedance testing before June, generator load bank runs before monsoon season, filter inspections after every significant dust event. That cadence isn't in any manufacturer's manual — it comes from working in Arizona facilities year-round.

New Phase technicians servicing EnerSys battery string, Arizona

How We Operate in Live Facilities

Replacing a 200kVA UPS in a live data hall — with the load riding an alternate power path, a maintenance bypass that may not have been operated in two years, and a transfer sequence that has to happen clean — is not the same work as wiring a commercial building.

Our technicians have been on the floor at Phoenix NAP, Digital Realty, and Iron Mountain. We plan every UPS job around your redundancy configuration. The switching sequence gets documented and confirmed with your operations team before anyone touches a breaker. We carry parts for Eaton, Vertiv, and APC — because at 2am, a parts order isn't a plan.

New Phase Electrical holds ROC License #348619, verifiable at roc.az.gov. WOSB certified for facilities with diversity procurement requirements.

Frequently Asked Questions

How do I know if my UPS needs to be replaced vs. repaired?

The two biggest factors are battery age and capacitor condition. VRLA batteries in Arizona heat typically have a 3–4 year effective lifespan (vs. 5+ years in cooler climates). If your UPS is over 10 years old, repair costs often exceed replacement costs within 2–3 years. We assess both options and give you a direct recommendation — we're not in the business of selling you a replacement you don't need.

How long does a UPS installation take for a data center?

A single UPS replacement is typically a one-day job. Larger installations with switchgear, bypass panels, and multiple units are planned in phases to maintain continuous power to the protected load. We work with your operations team to schedule around maintenance windows or — if a maintenance bypass is in place — during live operations.

What's the difference between a maintenance bypass and a static bypass?

A static bypass is built into most UPS systems and transfers load to utility power automatically on UPS failure — with no moving parts. A maintenance bypass is an external switch that allows technicians to physically isolate the UPS for service while the load remains on a separate bypass path. For facilities that can't afford downtime during UPS service, a properly installed maintenance bypass is essential infrastructure.

Do you service UPS systems you didn't install?

Yes. We take over maintenance contracts for existing UPS systems regardless of who installed them. We start with a baseline assessment to document current condition, then set up a PM program from there. We've inherited systems in every condition — from well-maintained to seriously neglected.

How often should a UPS be serviced at a Phoenix-area facility?

Annually at minimum. For Valley facilities, we recommend two inspections per year — one in April or May before peak thermal stress, focused on battery condition and cooling performance; one in October after monsoon season to address any dust infiltration and summer wear. Battery strings with more than three years of Arizona service should be on quarterly impedance testing regardless of visual condition.

Do you offer ongoing maintenance contracts for UPS systems?

Yes. We structure contracts around your equipment inventory and service cadence — monthly, quarterly, or semi-annual. Contracts include scheduled PM visits, priority emergency response, full service documentation, and trending data that tracks equipment condition over time. Call 480-262-6505 or email Nikki@NewPhaseElectrical.com to discuss your facility.

Related Services

Generator installation Arizona

Generators & Backup Power

Standby generator installation, ATS integration, and load bank testing for Arizona commercial and industrial facilities.

Generators
DC power plant Arizona

DC Power Plants

Telcordia Level 4 certified DC power plant installation, battery strings, and ongoing maintenance for telecom, colocation, and critical infrastructure.

DC Power Plants
UPS and DC power plant battery systems Arizona

Battery Systems

UPS and DC power plant battery replacement, capacity testing, and impedance trending for Arizona facilities.

Battery Systems

Don't Wait for a Power Emergency

Contact our certified team for a comprehensive assessment of your UPS needs

24/7 Emergency Service

480-262-6505

Round-the-clock response for critical power emergencies

Email Us

Nikki@NewPhaseElectrical.com

Project quotes and site assessment requests

Arizona Location

519 W. Lone Cactus Dr. Ste 103
Phoenix, AZ 85027

Serving all of Arizona